1. Development of resource-saving technologies for the preparation and inter-field transport of well products from the Achimov fields of the Urengoy field;Koryakin,2020
2. Calculation of the Minimum Required Flow Rates for Water Removal from Flooded Wells under the Conditions of the Yamburgskoye Field;Mugisho;IOP Conf. Ser. Earth environment. Science,2021
3. A New Technical Solution for Liquid Removal from Flooded Gas and Gas Condensate Wells (In Russ.);Drozdov;Territ. “NEFTEGAS”,2021
4. Forecasting watering of the stock of producing wells at large gas fields;Ponomarev;Vesti Gazov. Science,2012