Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects

Author:

Faten Albtoush A M,Doh S I,Rahman R A

Abstract

Abstract While all project parties agree that exceeding the budget results in project failures, most construction projects in Jordan are suffering from cost overruns. Understanding the root cause of the issue is critical to solve the problem comprehensively. However, the previous studies lack information on the underlying causes that are resulting in cost overruns among the nation’s construction projects. The principal purpose of this study is to identify the most significant causes of cost overruns in Jordanian construction projects. Therefore, the researcher used the quantitative approach for data collection through questionnaire survey among stakeholders in the construction project. This study uses the principles of multivariate statistics in analyzing the causes of cost overruns in Jordanian construction projects. The findings revealed that the four major underlying causes for cost overruns in Jordan are financial difficulties, materials issues, design issues and additional works. Besides, the results also revealed that high transportation cost, unrealistic contract duration, slow decision making, extra quantity during construction, inadequate funds for project financing, inconsistent cash flows and payment problems faced by the clients from the government are critical sub cause for cost overruns in the region. The findings on the critical and underlying causes for cost overruns may help industrial practitioners in developing strategies to achieve better project success.

Publisher

IOP Publishing

Subject

General Engineering

Reference70 articles.

1. Introduction to cost overrun in residential building: its causes and solutions;Jangale;International Journal of Engineering Research & Technology,2017

2. Significant factors causing cost overruns in the construction industry in Afghanistan;Niazi;Procedia Engineering,2017

3. Accelerating construction industry development;Kumaraswamy;Journal of Construction in Developing Countries,2006

4. Causes of construction delay: traditional contracts;Odeh;International journal of project management,2002

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Understanding the effects of variation orders on construction project success: insights from the Jordanian context;International Journal of Construction Management;2024-04-18

2. Sensitivity of Cost Overrun Propensity and Severity to Highway Project Bundling;Journal of Management in Engineering;2024-03

3. Development of a Taxonomy for Causes of Changes in Construction Projects;Buildings;2024-01-19

4. Comparative analysis between different risk score calculation approaches;Engineering, Construction and Architectural Management;2023-04-18

5. Structural model of cost overrun factors affecting Pakistani construction projects;Mehran University Research Journal of Engineering and Technology;2023-04-03

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3