Author:
Zhang Yang,Feng Qianwei,Li Sha,Xu Ketao,Pei Yukun,Zhu Yue
Abstract
Abstract
Since the beginning of the 12th Five-Year Plan, coal-fired power plants have carried out large-scale denitration and ultra-low emission transformation in China, among which SCR denitration technology is the most widely used. However, some hidden problems in the process of project implementation have gradually emerged after operation due to various factors, such as the centralized reconstruction task, lack of technical experience, inadequate quality control of main equipment, uneven quality of denitration catalysts, and insufficient operation and maintenance experience of power generation enterprises. In this context, the future direction of SCR denitration operation and maintenance management is proposed after a systematic summarization and analysis of the operation status of SCR denitration system in recent years to provide reference for subsequent work.
Reference12 articles.
1. Enhancement of SCR activity and SO2 resistance on VOx/TiO2 catalyst by addition of molybdenum[J];Kwona;Chemical Engineering Journal,2016
2. Key technical issues of environmental protection island of thermal power plant[J];Zhu;Power Generation Technology,2018
3. Oxidation of sulfur dioxide to sulfur trioxide over supported vanadia catalysts[J];Joseph;Applied Catalysis B: Environmental,1998
4. Oxidation of SO2 to SO3 over honeycomb deNOxing Catalysts[J];Svachula;Industrial&Engineering Chemistry Research,1993
5. Construction and implementation of the whole process management for SCR denitration catalyst[J];Zhen;Electric Power,2016
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献