Author:
Wang Shibo,WeiTeng ,Wang Nan,Cheng Yan,Sun Shumin,Xing Jiawei,Wang Yanzhuo
Abstract
Abstract
In the actual operation of the power system, some generating units may have physical limitations. For a unit with prohibited operating zone, its operation zone [Pmin, Pmax] will be divided into several discrete sub feasible regions. In this paper, the influence of units with prohibited operating zone on the system is deeply studied, and the influence of units with prohibited operating zone on other units in the system, including the influence between units with prohibited operating zone, and the optimal solution state of economic dispatch problem for units with prohibited operating zone are further studied. Then the iterative algorithm for the above three problems is modified. At the same time, the economic law and physical essence of the economic dispatch problem for units with prohibited operating zone are explored. With high calculation efficiency, the algorithm proposed in this paper has its own engineering application value.
Reference15 articles.
1. Reserve constrained economic dispatch with prohibited operating zones[J];Lee;IEEE Transactions on Power Systems,1993
2. A practical approach to real time economic dispatch considering unit’s prohibited operating zones[J];Fan;IEEE Trans. on Power Systems,1994
3. Fast and effective algorithm for economic dispatch with prohibited zones[J];Adhinarayanan,2006
4. Study on Co-dispatch Model under Unified Power Market[J];Huanju;Shandong Electric Power,2009
5. Research of Economic Dispatch Strategy with High Penetration of New Energy Generation[J];Tianyu;Shandong Electric Power,2014