Author:
Li Jing,Li Xu,Zhang Zhuoqun
Abstract
Abstract
In order to further improve the dynamic prediction effect of bridge engineering life cycle cost, a life cycle cost prediction model of bridge engineering is established by using decision tree algorithm, and the influence coefficient of bridge engineering characteristics on cost is analyzed by data acquisition method. After analysis, the project characteristics which have great influence on the cost of bridge engineering are determined. The decision tree algorithm is used to establish the dynamic prediction model of bridge engineering life cycle cost; through MATLAB software, a good bridge cost prediction model is gradually established, and the model is trained, modified and verified according to the actual engineering data. The dynamic prediction model of life cycle cost investment of bridge engineering is established by using decision tree algorithm, which effectively improves the prediction accuracy and has strong practicability.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献