Author:
Zhao Xin,Ni Tongyun,Miao Xujuan,Guo Lijuan
Abstract
Abstract
This paper proposed a method to determine the reasonable cost interval of power grid production technological transformation project based on Kernel Density Estimation (KDE). The general idea of the study of reasonable cost interval is to select sample data, determine the sample estimation method, remove the outlier data, and finally calculate the reasonable unit cost interval of power grid. The general idea of the study of reasonable cost interval is to select sample data, determine the sample estimation method, remove the outlier data, and finally calculate the reasonable unit cost interval of power grid technical transformation project. Taking the actual data of the disconnector replacement project as an example, this paper made statistics of the reasonable cost range of the power grid production technological transformation project, which provides a new idea and method for the reasonable determination of the cost range in the case of large amount of data.
Reference4 articles.
1. Cost deviation analysis of power grid production and technical transformation project;Qi;China Power Enterprise Management,2020
2. Wind power interval prediction based on nonparametric kernel density estimation;Sun;Water Resources and Power,2013
3. Data-Based Optimal Bandwidth for Kernel Density Estimation of Statistical Samples;Li;Commun Theor Phys,2018
4. Research on Prediction Method of Reasonable Cost Level of Transmission Line Project Based on PCA-LSSVM-KDE;Zhao,2019
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献