Analysis of Constraint Factors for Bridge Maintenance in Poso District

Author:

Fauzan ,Nirmalawati ,Kusnindar

Abstract

Abstract Bridge maintenance is a routine activity that must be carried out by the manager but the implementation of bridge maintenance in the Poso Regency has various obstacles. So the research will be carried out to know the constraint factors in the implementation of bridge maintenance. This type of research is descriptive, population of PUPR employees in the field of maintenance and contractors who have handled bridge maintenance projects, totalling 40 respondents. Calculation of data analysis using factor analysis. The results showed that there were six factors that hindered the implementation of bridge maintenance, namely: (1) Implementation of Construction Management during procurement & execution of work, (2) Project Resource Planning & Weather, (3) Implementation of project resources and communications, (4) Monitoring of project resources and resource conditions, (5) Commitment and material availability, (6) The quality of equipment in the field. The six factors influence 80,462%, and the remaining 19,538 % are influenced by other factors. It is suggested that the management needs to make these six inhibiting factors as a reference in determining the strategy or planning for the implementation of routine maintenance projects.

Publisher

IOP Publishing

Subject

General Engineering

Reference26 articles.

1. Evaluasi dan Program Pemeliharaan Jembatan dengan Metode Bridge Management System (BMS); Studi Kasus Empat Jembatan Propinsi D.I. Yogyakarta;Hariman;J. Civ. Eng. Forum,2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3