Ariany Zulfaidah,Pitana Trika,Vanany Iwan
Abstract
Abstract
In the shipbuilding industry, there is still little discussion and analysis of risk management in the shipbuilding process. From previous studies, it is probable that the material/component group has a high percentage of shipbuilding delays, but there are no publications that discuss ship components specifically. Various models have been developed related to risk assessment in shipbuilding, but mostly discussed on shipbuilding construction, company management and work safety in shipyards. This paper discusses the need for planning and risk assessment models for component availability in the construction of new ships in Indonesia. The aim is to review the methods that will be used in risk assessment, combined with quantitative evaluation methods in the procurement of component materials and ship building installations. The development of methods for risk analysis, with a combination of Failure Mode and Effect Analysis (FMEA) and Bayesian Network (BN) approaches, it is hoped that the most critical risks can be identified so that risk evaluation actions can be carried out.
Reference32 articles.
1. Pengembangan Industri Perkapalan Dapat Prioritas;Kemenperin,2020
2. Analysis of Local Ship Component Industry Development;Prasetyo;J. Wave,2016
3. Modeling Shipbuilding Industrial Cluster of East Java ’ S Competitive Advantage Using System Dynamic;Pratiwi;Int. J. Ind. Electron. Electr. Eng.,2016
4. Remanufacturing as a Sustainable Strategy in Shipbuilding Industry;Pavan;IFIP Adv. Inf. Commun. Technol.,2016
5. System development for establishing shipyard mid-term production plans using backward process-centric simulation;Ju;Int. J. Nav. Archit. Ocean Eng.,2020
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献