1. Application of acoustic transmission method in quality inspection of tunnel lining [J];Teng,2020
2. Research and Application of Full Section Testing Trolley for Tunnel Lining Quality [J];Haitao;Tunnel Construction (Chinese & English),2020
3. Design and Research of Tunnel Lining Quality Testing Trolley Based on Geological Radar Method [J];Wei,2019
4. Research on Non-destructive Testing Device for Tunnel Varch Quality [J];Mengchen,2021
5. Integrated application of 3D laser scanning and BIM technology in shield tunnel construction [J];Yuesheng;Guangdong Civil Engineering and Architecture,2021