Dzhusoev H,Sinenko S,Slavin A
Abstract
Abstract
The paper discusses popular software products for the development of a high-rise building calendar plan, such as Rillsoft and “Hector: designer-Builder. Selected automated systems development schedule are necessary functions of data processing, have the ability to filter, display, alternating different sets of data, consideration of their sequence and interrelation; a sequence change data sets and correcting the data. When defining the work item has an opportunity to address their implementation in a variety of ways: with a “standard” single-variant technology; with recommended production technology; multiple technology. The content of software systems is unequal, and they contain extensive graphic and text databases, a comprehensive library of normative and methodological documents, numerous technological guides, a library of technological schemes and standard technological maps, examples of the development of organizational and technological documentation. Work in software complexes was carried out both in local mode on the separate computer, and in a network mode with support of simultaneous work of several users in a local network. The program modules which are a part of program complexes which are intended for the automated decision of the most difficult and labor-consuming tasks of organizational and technological design according to requirements of the operating normative and methodical documentation were used. It is concluded that a more detailed analysis of programs is needed to select the most optimal range of tasks for each software product.
Reference26 articles.
1. An evolutionary approach to estimating software development projects;Aguilar-Ruiz;Information and Software Technology,2001
2. Implementation of enterprise resource planning (ERP) systems in the construction industry;Ahmed;Construction Research Congress: Wind of Change: Integration and Innovation,2003
3. Fuzzy sets on step of planning of experiment for organization and management of construction processes;Lapidus,2016
4. Statistical learning problem of artificial neural network to control roofing process;Lapidus,2017
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Criteria for selection an option for continuing project construction;PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON FRONTIER OF DIGITAL TECHNOLOGY TOWARDS A SUSTAINABLE SOCIETY;2023
2. Selection of Organizational and Technological Solutions for Construction;IOP Conference Series: Earth and Environmental Science;2020-04-01