Multicriteria Decision Model for Road Construction Project

Author:

Ramlay SN,Razi PZ,Ali MI,Ramli NI,Saad MSH,Jamaludin O,Doh SI

Abstract

Abstract Construction of roads plays an important role in linking one area to another, and also acts as a substance for the local economy. However, the limitation of study on the project performance towards the road infrastructure construction project requires more precise attention. Thus, it requires distinct responsiveness from contractors to evaluate and cope with the risks. This study aims to identify the project execution risk factors involved in the road construction project, reference to a current case study from a federal government project Public Work Department (PWD) on the East Coast of Malaysia: Upgrading 14.7 kilometre (km) federal road from the Pekan town to Sungai Miang. This study will begin with the identification of the project execution risk factors, utilizing an extensive review of the literature. Next, the gathered risk factors will go through a pilot phase validation interview with road construction experts from the public work department (PWD) and also construction practitioners that are involved directly in the project case study. Findings found seven (7) main project execution risk factors involved in the road construction project, which include resource risk, land acquisition issue, project management issue, technical risk, service utility issue, unforeseen ground condition, and force majeure risk. Among the seven (7) factors twenty-one (21) project execution risk sub-factors, were further explored that are crucial to the project. The main contribution of this study is the final multi-criteria decision model obtained from literature searching cross-referenced to the real case study that may be beneficial to the road construction project team specifically.

Publisher

IOP Publishing

Subject

General Engineering

Reference37 articles.

1. Incorporation of Risk Index for Risk Response and Risk Mitigation Strategies of Public-Private Partnership (PPP) Housing Construction Project in Malaysia;Razi;IOP Conference Series: Materials Science and Engineering,2020

2. An Evaluation of Risk Impacting Highway and Road Construction Projects in Nigeria;Chileshe;Proceedings of 2010 International Conference on Construction and Real Estate Management,2010

3. Causes of delay in construction of highway projects: A review;Karunakaran;International Journal of Civil Engineering and Technology,2019

4. Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study;Zafar;Korean Society of Civil Engineers,2016

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3