The construction of Karalloe multipurpose dam for the Kellara technical irrigation development

Author:

Hasbi M,Subandi ,Mappanyompa M,Bakri B

Abstract

Abstract The problem of Jeneponto regency is a raw water crisis for water drinking and irrigate in dry season. In rainy season, a high sediment to deposit in the lowest area. the regulate flooding and inundates rural and urban. A Jeneponto river is a joint river between Karalloe River and Kellara River which come from Lompo Batang mountain and the existing raw water is not enough to be supplied to the raw water treatment plant and not enough to be supplied to the existing Kellara technical irrigation area so the rice cropping is not optimize although existing Kellara weir and Karalloe weirs will support the irrigation. To solve the problem mentioned above, the Karalloe multipurpose dam will be constructed urgently. The problem will be managed by sustainable integrated water resources management, Step by step method to be applied in 3 terms for example in the short term, the middle term and the long term. Methodology study of this paper focused to solve the raw water crisis and regulate flooding in Jeneponto Regency. The governments apply by not only construction of the Karalloe Dam but also to apply an integrated approach.

Publisher

IOP Publishing

Subject

General Engineering

Reference11 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3