Author:
Ge Hua,Deng Chunyan,Gong Ping
Abstract
Abstract
The trend of a river erosion and deposition is the first construction condition for a bridge construction. In order to evaluate the construction conditions of a bridge located at the end of Ganjiang River, based on the two-dimensional flow and sediment mathematical model, the amount and distribution of sediment erosion and deposition in the river reach under various typical and series of annual flow and sediment processes were calculated and analysed in this paper. The results show that the river reach where the project is located is dominated by micro siltation under various water and sediment processes, but the unfavourable conditions caused by local scour of piers should be considered in the construction of the project.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献