Study on prediction of riverbed erosion and deposition at tail of Ganjiang River

Author:

Ge Hua,Deng Chunyan,Gong Ping

Abstract

Abstract The trend of a river erosion and deposition is the first construction condition for a bridge construction. In order to evaluate the construction conditions of a bridge located at the end of Ganjiang River, based on the two-dimensional flow and sediment mathematical model, the amount and distribution of sediment erosion and deposition in the river reach under various typical and series of annual flow and sediment processes were calculated and analysed in this paper. The results show that the river reach where the project is located is dominated by micro siltation under various water and sediment processes, but the unfavourable conditions caused by local scour of piers should be considered in the construction of the project.

Publisher

IOP Publishing

Subject

General Engineering

Reference5 articles.

1. Warning time-based framework for bridge scour monitoring;Azhari;Journal of Bridge Engineering,2020

2. Scour Depth Prediction for Asa Dam Bridge, Ilorin, Using Artificial Neural Network;Odeyemi;International Journal of Engineering Research in Africa,2020

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Combined method for calculating the total erosion of channels composed of easily erodible grounds;IOP Conference Series: Earth and Environmental Science;2023-05-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3