Author:
Shakurova Alsu F,Shakurova Aygul F
Abstract
Abstract
The paper deals with the use of geotechnical monitoring data to substantiate commissioning of production facilities in the Serginsky field. At the first stage, the geological and physical features of the reservoirs of the Serginsky field were considered; at the second stage, the results of substantiation were adjusted with regard to technological and economic factors. In addition, the experience of deposit exploitation gained during the period of pilot industrial development of the field was considered to substantiate commissioning of production facilities. The main part of the oil reserves of the Serginsky field (85%) is accumulated in two reservoirs J2-3 and J10. Geological oil reserves of J1 and J4 reservoirs account for about 15.2% of the total oil reserves of the field.