Selection of jacking sequence and jacking parameter analysis of multi-row jacking pipes in water-rich sand

Author:

Deng Wenjie,Cao Guangyong,Lin Jian,Yang Junfeng,Yu Shixiang,Yang Zubing

Abstract

Abstract For the purpose of safe and efficient construction of multi-row pipe jacking in water-rich sand layer, a case study was carried out, taking the three-row pipe jacking project of the water-rich sand layer in Haikou city as an example. Firstly, based on the analysis of the disturbance mechanism of surrounding rock in multi-row pipe jacking construction, the principle that multi-row pipe jacking construction should give priority to excavate two pipe jacking tunnels which are far apart in turn was established. Secondly, taking the maximum ground settlement at the center of pipe jacking as the judgment index, the optimal scheme of the construction sequence of multi-row pipe jacking was determined. Finally, based on the field measured data, the relationship between the jacking force, the pressure of the palm surface, the average frictional resistance and the jacking process during the jacking process was analyzed, and summarized the experience of the site construction. The results show that: (1)it is better to give priority to construct two pipe jacking tunnels which are far apart in the construction order multi-row pipe jacking; (2)Based on the empirical method of surface subsidence, the maximum surface subsidence at the center of pipe jacking group can be used as the judgment index to determine the optimal jacking sequence; (3)Under the condition of "from the two sides to the middle", the surrounding rock around the middle jacking pipe is greatly disturbed by the construction of the first jacking pipe, its jacking rate should be reduced on the basis of the first building jacking pipe, and the cutting rate of the cutter and the grouting pressure should be increased, so as to realize the continuous jacking construction. The results of this paper are of great reference value to the determination of the jacking parameters of multi-row pipes in the future.

Publisher

IOP Publishing

Subject

General Engineering

Reference22 articles.

1. Relationship of jacking force and average friction with jacking path in pipe-jacking construction;Xiang;J. Rock and Soil Mechanics,2008

2. Experimental and analytical study of friction forces during micro tunneling operations;Pellt;J. Tunnelling and Underground Space Technology,2002

3. Analysis of thrust force by using slurry pipe jacking method in sandy clay soil;Yang;J. Journal of China Coal Society,2006

4. Discrimination and analysis of formulae for jacking forces in pipe-jacking;An;J. Rock and Soil Mechanics,2002

5. Theoretical and experimental analyses of jacking force during deep-buried pipe jacking;Yang;J. Rock and Soil Mechanics,2013

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3