Author:
Aghelinejad Mohammad Mohsen,Ouazene Yassine,Yalaoui Alice
Abstract
Abstract
The necessity of managing a production system with less cost and pollution in such a competitive world has enticed the attention of many researchers. This paper deals with a multi-state two-machine flow-shop scheduling problem under Time-Of-Use electricity tariffs. The main issue is to assign a set of jobs to available time slots with different energy costs to minimize the total energy consumption costs. For this purpose, a new linear programming (LP) model is proposed, and several numerical results are solved using CPLEX Studio 12.9.0 solver to evaluate the effciency of the proposed model for the problem. The obtained results demonstrate that CPLEX solver is not able to find the optimal solution for the problems as large as 20 jobs and 90 periods during the 3600 seconds time limitation.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献