Cost Overrun Factor of Toll Road Project Construction

Author:

Isfahani Muhammad Nafhan,Romadhon Eri Setia,Romadhon Muhammad Imany

Abstract

Abstract Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate. For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%. Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence. Cost overruns are one of the problems faced by most construction projects in Indonesia. Unexpected budget cost overruns can create many problems in the project. Therefore, every stakeholder in the project needs to have a good understanding of factors that cause cost overruns to avoid or minimize it risks in the project. The purpose of this study is to identify the factors that cause cost overrun on a project and analyze the factors that are most influential on the occurrence of cost overrun on construction projects. This study used a systematic literature review to collect data from previous studies. This study resulted in 6 management elements, consisting of 85 variables identified in this study. 6 management elements factors, including material factors, labor factors, equipment factors, subcontractor factors, financial factors, and external factors. This is a fairly broad category that includes projects. The most cause factor of cost overrun land acquisition problems

Publisher

IOP Publishing

Reference15 articles.

1. Causes of delay on highway construction projects in Thailand;Thapanont;MATEC Web of Conferences,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3