Ma Xingbin,Zhang Suiyu,Li Moxiao
Abstract
Abstract
The power grid lines and equipment maintenance of power enterprises is a complicated construction process, the cost of which is affected by meteorological and geographical factors, and the influence mode is uncertain. Using fuzzy clustering method and the threshold intervals of the objective function in clusters, this paper builds a predictive control model to control the project cost. This model uses relative fuzzy operator to build fuzzy matrix, construct correlation between factors, and describe the factors’ effect. Extracting the cluster’s eigenfunction, and defining the boundaries of various clusters, we determined the type of the predicted points and the range of the objective function. When the actual cost of the maintenance project is within the range calculated by the cost model, then it is normal. If the actual cost exceeds this range, then further analysis of all the aspects of the cost is needed to find out the reason.
Reference18 articles.
1. The Appliance of Standard Cost Method In Cost Control Syste;Liu;Journal of Industrial Technological Economics,2002
2. BP’s multi-enterprise asset managementsystem[J];Holland;Information and Software Technology,2005
3. Cost management: From Frederick Taylor to the present[J];Cooper;Journal ofCost Management,2000
4. An Analysis of Contract Cost Phasing on Engineering Construction and Construction Projects[J];Berends;The Engineering Economist,2004