Author:
Baroroh I,Ariana I M,Dinariyana A A B
Abstract
Abstract
The Implementation of modular construction shipbuilding aims to accelerate ship production so that delivery time can be shortened. However, in its implementation, delay for completing and delivery the ship can still be found. The delay in delivery is influenced by the supply chain performance of the shipyard due to delays in design, material, and financial payments. This delay occurred due to the large number of sub-module and module construction works carried out in parallel. The works include hull construction, painting, outfitting and installation of equipments. This study aims to analyze the performance of the supply chain in shipyard that implementing modular construction system. In the initial stage, the study is conducted by defining the factors and parameters that affect supply chain performance in shipbuilding and determining factors that have the potential to cause delivery delays. The conceptual and technical approach is carried out by analyzing the causal relationship of the factors that have identified in the previous stage. Dominant factors that cause delays that occur in ship building are expected to find and observe using system dynamics approach.
Reference12 articles.
1. Measurement of Technology Readiness for Container Ship 100 TEUs Building with Modular System at PT. PAL Indonesia;Virliantarto;Jurnal Wave,2017
2. Procedure for estimating the effectiveness of ship modular outfitting;Rubesa;Eng Rev.,2011
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Supplier Development Case COTECMAR: Lessons Learned for the Shipbuilding Sector;Springer Series on Naval Architecture, Marine Engineering, Shipbuilding and Shipping;2024