Hydropower units undertake the tasks of frequency modulation and peak load regulation, flood control and discharge in flood season. When the unit working condition changes greatly, the stability of unit output will be affected. Therefore, the study of the transient process is of great significance to maintain the stability of hydropower units. This paper introduces a calculation method of transition process based on comprehensive characteristic curve. Based on the data of the comprehensive characteristic curve of Chaijiaxia hydropower station, the full characteristic surface of the turbine is obtained by BP neural network algorithm. Finally, the differential algebraic equation of the transient process of the turbine is established, and the transient process is solved by combining with the full characteristics of the turbine.
Reference13 articles.
1. Research on nonlinear controller for hydro generator sets[J];Sun;Proceedings of the CSEE.,2001
2. Experiential and Numerical Study of Pressure Fluctuation in High Head Pump Turbine[C];Blanc-Coquand,2000
3. Rational B-splines for curve and surface representation [C];Tiller;IEEE Computer Graphics and its Application,1983
4. Dependency on Runner Geometry for Reversible-Pump Turbine Characteristics in Turbine Mode of Operation[J];Olimstad;Journal of fluids Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献