Author:
Arsakulasooriya Kavindu Kanishka,Sridarran Pournima,Sivanuja Thirumal
Abstract
Purpose
Compared to low-rise and mid-rise buildings, commercial high-rise buildings have severe maintenance management deficiencies due to the complex nature of the structure and building services incorporated. Previous studies have shown that implementing lean in maintenance is a recognised prominent strategy to enhance maintenance performance. Thus, this study aims to investigate how lean maintenance can be applied to improve maintenance management in commercial high-rise buildings in Sri Lanka.
Design/methodology/approach
This study adopted a case study method. Three commercial high-rise buildings were selected to conduct the empirical study. An expert survey is also conducted to validate the findings.
Findings
The findings of the study revealed that out of the eight cardinal types of lean maintenance waste, six are rooted in the selected cases: (i) excessive preventive maintenance, (ii) waiting (maintenance resources, tools, procuring of additional supplies and documentation and permits), (iii) transportation due to centralised maintenance, (iv) poor inventory management, (v) poor information handling and (vi) poor utilisation of labour. Then the study revealed strategies to eradicate identified lean maintenance wastes.
Practical implications
The findings of this study can be used to guide maintenance practitioners in implementing lean maintenance in Sri Lankan commercial high-rise buildings. Furthermore, the proposed strategies can be directly applied to mitigate identified maintenance wastes.
Originality/value
This paper provides information on how high-rise commercial buildings in Sri Lanka can enhance their maintenance management by mitigating lean maintenance wastes.
Subject
Building and Construction,Architecture,Human Factors and Ergonomics
Reference21 articles.
1. Buildings lean maintenance implementation model;Open Engineering,2016
2. Management problems associated with multi-tenanted high-rise commercial buildings in Kaduna metropolis;Nigeria,2016
3. Measuring the effectiveness of lean thinking activities within maintenance,2016
4. M a l m,2012
5. Lean manufacturing: trends and implementation issues;Periodicals of Engineering and Natural Sciences (PEN),2018
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献