Abstract
Purpose
Although prior research provides evidence that production ramp-up is often disrupted by supplier-related problems, it fails to discuss how the original equipment manufacturer (OEM) and various types of suppliers integrate their functions and operations to secure preparations for production ramp-up. The purpose of this paper is to investigate OEM–supplier integration in a new product development (NPD) project to prepare for production ramp-up.
Design/methodology/approach
The results presented in this paper are based on a real-time, longitudinal study of a single collaborative NPD project in the mechanical engineering industry. The NPD project involves seven suppliers and it is carried out in a large Swedish company (the OEM) and fits the theory-elaborating approach of this research.
Findings
This study argues that the aspect of timing in OEM–supplier integration, the OEM’s research and development (R&D) attitude toward collaboration and the OEM’s (R&D) operating procedure are challenges affecting the preparation for production ramp-up. The following three mechanisms to facilitate OEM–supplier integration in order to prepare for production ramp-up are also discussed: the mediator’s role, the OEM’s face-to-face meeting at the project level and suppliers’ formal face-to-face meetings with the OEM and internally.
Originality/value
This paper elaborates on and extends prior research on production ramp-up by conducting an empirical analysis that incorporates supplier integration in NPD. It bridges the gap between the literature on production ramp-up and on supplier integration in NPD and clearly indicates that supplier integration is an important prerequisite for successful production ramp-up.
Subject
Industrial and Manufacturing Engineering,Strategy and Management,Computer Science Applications,Control and Systems Engineering,Software
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献