1. A weighted approach for assembly line design with station paralleling and equipment selection
2. Integrating inspection-policy design in assembly-line balancing
3. The Design of Imbalanced Series Queue Flow Lines
4. Hillier, F.S. and Boling, R.W. (1966), “The effect of some design factors on the efficiency of production lines with variable operation times”, Journal of Industrial Engineering, Vol. 17 No. 12, pp. 651‐8.
5. Hillier, F.S. and Boling, R.W. (1977), “Toward characterizing the optimal allocation of work in production line systems with variable operation times”, in Rowbens, M. (Ed.), Advances in Operations Research, North‐Holland, Amsterdam, pp. 649‐58.