Author:
Afzal Farman,Shehzad Ayesha,Rehman Hafiz Muhammad,Afzal Fahim,Mukit Mohammad Mushfiqul Haque Mushfiqul Haque
Abstract
Purpose
Cost estimation is a major concern while planning projects on public–private partnership (PPP) terms in developing countries. To bridge the gap of the right approximation of cost of capital, this study aims to sermon a significant role of investor’s risk perception as unsystematic risk in PPP-based energy projects.
Design/methodology/approach
To investigate the effective mechanism of determining cost of capital and valuing the capital budgeting, a pure-play method has been acquired to measure systematic risk. In addition, dynamic conditional correlation (DCC) and generalized autoregressive conditional heteroscedasticity (GARCH) models have been applied to calculate weighted average cost of capital.
Findings
Initially, a joint cost of capital of energy-related projects has been calculated using DCC-GARCH and pure-play method. Investors risk perception has been discussed through market point of view using country risk premium modeling. Latter yearly betas have been calculated using DCC signifying the final outcomes that applying a dynamic model can provide a better cost estimation in emerging economies.
Practical implications
The findings are implicating that due to the involvement of international investors, domestic risk is linked with country risk. In such situations, market-related information is a key factor to find out the market performance, helping in the estimation of cost of capital through capital asset pricing model (CAPM). High dynamic nature of emerging economies causes an impediment in the estimation of cost of capital. Consequently, to calculate risk in dynamic markets, this study has acquired DCC model that can predict the value of beta factor.
Originality/value
Study contributes to the body of knowledge by addressing an important issue of investor’s risk perception and effective implication of CAPM using pure-play and DCC-GARCH when data is not promptly available in dynamic situations.
Subject
Finance,Business and International Management
Reference75 articles.
1. ADB (2019), “Country partnership strategy: Pakistan, 2015 – 2019”, available at: www.adb.org/sites/default/files/linked-documents/cps-pak-2015-2019-sd-06.pdf
2. A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies: cost overrun in construction projects;International Journal of Managing Projects in Business,2021
3. Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects;Engineering, Construction and Architectural Management,2019
4. Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects;Engineering, Construction and Architectural Management,2019
5. Cost-risk contingency framework for managing cost overrun in metropolitan projects: using fuzzy-AHP and simulation;International Journal of Managing Projects in Business,2020