Author:
Zhang Hong,Yu Lu,Zhang Wenyu
Abstract
PurposeThis study is aimed to explore the dynamic performance incentive model for a flexible PPP contract to handle uncertainties based on supervision during the long-time concession period, so as to ensure operation performance and benefits of the public sector while protecting the economic benefit of the private sector, thus avoiding unnecessary renegotiation.Design/methodology/approachThe microeconomic and principal–agent theories and relevant studies on the basic incentive model and flexible contract are fully utilized. The procedure for developing the dynamic incentive model and the assumptions about the quantitative relationships among fundamental variables or factors are first proposed. The static incentive model without incentive parameter adjustment and then the dynamic incentive model allowing incentive parameter adjustment are successively developed. Finally, the propositions regarding the valid adjustment ranges of the incentive parameter with respect to the economic, social and hybrid benefits of the public sector and the economic benefit of the private sector are suggested.FindingsThe dynamic incentive model enables to achieve a flexible contract to handle uncertainties on the PPP project to ensure the benefits of the public sector while protecting the benefit of the private sector. The economic, social and hybrid benefits of the public sector and the economic benefit of the private sectors can be respectively realized through adjusting the reward–punishment coefficient under different adjustment ranges and different importance. The incentive model is able to ensure the benefits of the public sector while protecting the benefit of the private sector by controlling the private sector's effort level unknown to the public sector.Originality/valueThe dynamic incentive model helps implement a flexible PPP contract to handle uncertainties during the operation period, thus controlling the effort level of the private sector and ensuring the benefits of the public sector while protecting the economic benefit of the sector. It enables to clarify the quantitative relationships between the operation performance, the benefits of the stakeholders, the effort level of the private sector and the reward–punishment coefficient. This study contributes to the domain knowledge of the incomplete contract theory for designing a flexible PPP contract with dynamic incentive and supervision mechanism by applying the microeconomic and principal–agent theories.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference36 articles.
1. The cost of using private finance for roads in Spain and the UK;Australian Journal of Public Administration,2010
2. Costly bargaining and renegotiation;Econometrica,2001
3. Opening the black box of contract renegotiations: an analysis of road concessions in Chile, Colombia and Peru,2013
4. Rent seeking behavior and incentive supervision model of PPP project from the perspective of contract;Scientific Decisions,2015
5. Flexible contracts to cope with uncertainty in public–private partnerships;International Journal of Project Management,2013
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献