Determining the level of development for BIM implementation in large-scale projects

Author:

Alshorafa Raif,Ergen Esin

Abstract

Purpose Proper definition of level of development (LOD) is one of the significant issues in building information modeling (BIM) applications; however, it is still not adequately addressed during BIM implementations. The purpose of this paper is to investigate and describe the current practice in defining the LOD in large-scale BIM-based projects and identify the challenges and solutions that were provided. Design/methodology/approach Four case studies were performed at four different types of large-scale projects to depict the current practice in determining the LOD and the required properties of elements that are going to be included in a BIM model. Semi-structured face-to-face interviews were performed to collect information from six professionals from four international firms. Findings The findings of the case studies revealed that defining LOD is an ambiguous process and requires high-cumulated experience. The results provide the challenges, adopted solutions and lessons learned. It was highlighted that the cost of including an element or related information in the model should be compared to the benefit of having that information in the model from the perspective of defined BIM uses. Research limitations/implications The findings are based on the projects that were performed in three developing countries. However, the main contractors were international companies and the construction management firms were well-known companies in the USA. In the future, additional case studies can be performed in other countries to identify similarities and regional differences. Practical implications The results of this study can be used to highlight the current needs in determining the LOD and guide the efforts for developing standards and policies in the AEC sector to streamline BIM adoption process in practice. The practitioners can utilize the findings of this study to increase their efficiency in adopting BIM and to decrease the time loss and cost overruns. Originality/value Most of the previous studies investigated the benefits and challenges when adopting BIM, and few of them considered LOD definition as a core part of this process. This study specifically investigated the current practice in determining the LOD and the required properties of elements that are going to be included in a BIM model. It also described the applied solutions and lessons learned in the case studies.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference48 articles.

1. AEC BIM Technology Protocol (2015), "Practical implementation of BIM for the UK Architectural", Engineering and Construction (AEC) Industry, AEC

2. (UK) CAD & BIM Standards Site, available at: https://aecuk.files.wordpress.com/2015/06/aecukbimtechnologyprotocol-v2-1-1-201506022.pdf (accessed December 2019).

3. BIM implementation plans: a comparative analysis,2012

4. Contractors’ transformation strategies for adopting building information modeling;Journal of Management in Engineering,2015

Cited by 25 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3