Investigating the significance of risks in BOT transportation projects in Vietnam

Author:

Le Phuong Thi,Chileshe NicholasORCID,Kirytopoulos Konstantinos,Rameezdeen Raufdeen

Abstract

PurposeThe Built Operate Transfer (BOT) model has been increasingly used in transportation investments in Vietnam. However, there is still an inadequacy of risk management applications in these projects and lack of research in this area. The study aims to improve the success of projects implemented through the BOT model in Vietnam.Design/methodology/approachThe study followed a sequential design including interviews and a questionnaire survey to investigate the perception of stakeholders from public and private sector regarding the probability of occurrence and the severity of impact of risks in BOT transportation projects in Vietnam. Quantitative data from the survey was subjected to descriptive and inferential statistics to explore the priority of risks as well as the differences in the perception between the public and private sectors.FindingsThe results showed that the top five most significant risks in BOT transportation projects in Vietnam are: (1) problems with land acquisition and compensation, (2) inappropriate location of toll booths, (3) public resistance to pay, (4) high toll rate and (5) lack of cash flow. With the exception of “lack of cash flow,” there were no statistically significant differences in the rankings of individual risks between the public and private sector. In addition, there is a significant positive correlation in the overall rankings of all risks for both sectors.Originality/valueThis study contributes to the body of knowledge by exploring the probability of occurrence and the severity of the impact of risks in BOT transportation projects in a developing country like Vietnam which has not been extensively explored yet. Second, it provides an insight into the perception of stakeholders from the public and private sector regarding the level of risks which is very useful for potential stakeholders in making decisions when they intend to participate in such partnerships. Third, it enables the Vietnamese government to establish suitable policies related to such projects. These contributions are very important in improving risk management in PPPs in developing countries.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference55 articles.

1. Role of financial risks in BOT megatransportation projects in developing countries;Journal of Management in Engineering,2017

2. Design and construction risks in BOT type mega transportation projects;Engineering Construction and Architectural Management,2019

3. Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach;Expert Systems with Applications,2015

4. Analysis of traffic revenue risk factors in BOT road projects in developing countries;Transport Policy,2017

5. Risk management in motorway PPP projects: empirical-based guidelines;Transport Reviews,2015

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3