Developing an effective renovation plan: the influence of data collection tools

Author:

Ogbeifun Edoghogho,Mbohwa Charles,Pretorius Jan-Harm Christiaan

Abstract

Purpose All built facility begins to show signs of deterioration immediately after the facility is completed and put to use, thus necessitating routine maintenance. Increase in defects due to age, usage, and other factors, requires extensive maintenance activities known as renovation. The data used for a typical renovation plan can be collected using the condition assessment (CA) tool which depends on physical inspection of the defects or through a facility condition index which hinges on harnessing and analyzing the information in the operational history of the facility. The purpose of this paper is to examine the quality of a typical renovation plan using both tools. Design/methodology/approach The single case study of qualitative research was adopted. The data were collected through the principle of semi-structured questionnaire complemented with interviews and document analysis. The documents include periodic operational reports and a CA report used for planned renovation exercise of the Facilities Management (FM) Unit in a higher education institution in South Africa. Findings The findings revealed that although the FM Unit produces periodic reports, but there was no evidence of detailed analysis of the reports. Therefore, the programmed renovation exercises are based purely on the information from a CA. Research limitations/implications This research is a single site case study of qualitative research; the data collected are limited and not sufficient for generalization of the results. Furthermore, the lack of record of the analysis of the operational history in the periodic reports negatively affected the computation of facilities condition index (FCI). Thus it was not possible to demonstrate the strength of FCI over CA from empirical information. Originality/value The quality of a typical renovation plan is influenced by the tool used for data collection. Although the CA tool is commonly used, experience shows that the renovation exercise developed from such records is prone to many execution setbacks, such as frequent scope changes and the associated cost and time overruns. These setbacks can be minimized if the FCI is used as the tool for data collection.

Publisher

Emerald

Subject

Building and Construction,Civil and Structural Engineering

Reference31 articles.

1. Evaluation of building component for strategic facilities management;International Journal of Computational Engineering & Management,2014

2. The potential effects of variation orders on institutional building projects;Facilities,2005

3. The facilities condition index: a useful tool for capital asset planning;Facilities Manager,2001

4. A survey of maintenance management systems in South Africa tertiary educational institutions;Construction Management and Economics,2006

5. Knowledge-based FM: managing performance at the workplace interface;Facilities,1995

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3