Author:
Durmusoglu Mehmet Bulent,Aglan Canan
Abstract
Purpose
The inherent variability on process times and demand are the factors that prevent the efficient application of lean philosophy in multi-project product development (PD) environments. Considering this variability, a hybrid push–pull project control system is developed, and value stream costing (VSC) analysis is performed to reflect the relation between project lead time, capacity and project cost. The assessment of the push/pull project control on lead time improvement and long-term savings on capacity have been aimed with the proposed complete design structure.
Design/methodology/approach
In a team-based structure, formed through clustering, push control techniques for planning tasks within cross-functional teams and pull control techniques for planning tasks between cross-functional teams are developed. The final step evaluates the proposed structure through VSC and long-term savings have been pointed out, especially in terms of freed-up capacity. For the validation of the proposed methodology, an office furniture manufacturing firm’s PD department has been considered and the performance of the hybrid system has been observed through simulation experiments and based on the simulation results, the lean system is evaluated by VSC.
Findings
The results of simulation experiments show a superior performance of the proposed hybrid push/pull project control mechanism under different settings of cycle time between projects or shortly project cycle time, dispatching rules within teams and variability levels. The results of the Box-Score (tool to apply VSC) indicate increased capacity in the long term to add extra projects during the planning period with the same project lead time and without additional cost.
Research limitations/implications
Although extensive simulation experiments have been performed to quantify the effect of project control structure and positive results have been reported on lead time and cost, the proposed design structure has not been tested in all existing PD environments.
Originality/value
To the best of authors’ knowledge, the quantification of the effect of hybrid project control with VSC is the first attempt to be applied in lean PD projects.
Reference99 articles.
1. Lot-splitting approach of a hybrid manufacturing system under CONWIP production control: a mathematical model;International Journal of Production Research,2015
2. An exploratory study of waste in software development organizations using agile or lean approaches: a multiple case study at 14 organizations;Information and Software Technology,2019
3. Software project management approaches for monitoring work-in-progress: a review;Journal of Engineering and Applied Sciences,2017
4. Approximate bounds for the buffer allocation problem using mathematical programming representation,2010
5. Lean design for six sigma: an integrated approach to achieving product reliability and low-cost manufacturing;International Journal of Quality and Reliability Management,2015