Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis

Author:

Zhang Youxi,Liu YuORCID,Yu Rui,Zuo JianORCID,Dong Na

Abstract

PurposePrefabricated construction (PC) can benefit construction industry due to its high efficiency, energy saving, consumption reduction and safety. However, the high capital cost is a critical challenge hindering its development in China. The collaboration of PC stakeholders is conducive to improving cost management efficiency and optimizing resource allocation which has been ignored in previous studies. Therefore, this study aims to explore the collaboration paths of stakeholders in the process of solving critical cost influencing factors (CIFs) of PC to reduce costs.Design/methodology/approachFirstly, 25 CIFs and five main stakeholders that affect PC capital cost were identified through literature research and expert interviews. Then, questionnaires were used to investigate the relationship between stakeholders and CIFs from the perspectives of three stakeholder attributes of proximity, attitude and power, respectively. Finally, based on the survey data, three stakeholder-CIF networks from three attributes perspective and a comprehensive network were constructed and used for subsequent social network analysis.Findings(1) Stakeholders mainly show willingness and potential to collaborate on organization and management factors; (2) More stakeholders pay attention to incentive policies and the setting of prefabrication rates and assembly rates, while all stakeholders have the right to facilitate information and resource sharing in the PC supply chain; (3) The comprehensive network shows a core-periphery structure. As core stakeholders, contractor, designer and manufacturer are more likely to actively manage the 14 core CIFs.Originality/valueThis paper innovatively combined stakeholder and cost management in PC, and used two-mode network based on three stakeholder perspectives to reveal the collaboration potential and motivation of stakeholders in PC cost management. The findings not only provide guidance for stakeholders to find potential partners and optimize resource allocation in solving specific cost issues, but also facilitate stakeholders' sustainable collaboration to achieve PC's cost performance.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference69 articles.

1. A comprehensive stakeholder-typology model based on salience attributes in construction projects;Journal of Construction Engineering and Management,2019

2. An algorithm for clustering relational data with applications to social network analysis and comparison with multidimensional scaling;Journal of Mathematical Psychology,1975

3. Hierarchical cluster analysis;Psychological Reports,1966

4. Identifying enablers for coordination across construction supply chain processes: a systematic literature review;Engineering, Construction and Architectural Management,2020

5. Research on the restrictive factors of the development of Chinese prefabricated buildings

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3