A structural equation model to assess the effects of strategic and project related potential risks on project delivery in Qatar

Author:

Gunduz Murat,Abumoza Abdulla M.,Aly Aly AbdelfattahORCID

Abstract

PurposeThe aim of this paper is to study the effect of strategic and project related potential risks on project delivery in Qatar. Two objectives have been defined. The first is to identify potential risk indicators (manifest variables) and categorize them (constructs/latent variables) based on a literature review, while the second is to examine and rank the relationships between the indicators and constructs by developing a structural equation model.Design/methodology/approachTwenty-five indicators were identified from the literature review and categorized into five groups. To collect the data, an online questionnaire was distributed in Qatar, and 116 responses were obtained. Structural equation modeling (SEM) was used to examine the model. The model that was developed based on the research hypothesis met goodness-of-fit, reliability and validity requirements.FindingsThe results showed that all constructs contributed well to the model and that the project parties (PPs) have the highest contribution with an effect weight of 0.209 followed by economic and legal (EL) conditions with an effect weight of 0.205. Site and safety (SS) conditions were third with an effect weight of 0.200 while environmental, natural and technological (ENT) conditions were fourth with an effect weight of 0.1989. The last ranked construct is political and social (PS) conditions with an effect weight of 0.186. Based on the outcome of the SEM, recommendations were provided to industry professionals in Qatar about mitigating the impact of potential risks on construction project.Originality/valueTo the authors' best knowledge, this is the first study to quantify the effects of strategic and project related risks on a construction project using SEM, considering the risk management indicators of SS, EL, ENT, PS in Qatar. The study's practical implications are to enlarge the project's risk management plan by considering the strategic and project related risks to enhance the project performance for the cost overrun and delay. The study is intended for construction projects in Qatar, but it can easily be adapted to other parts of the world given the local circumstances.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference58 articles.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3