Author:
Chan Daniel W.M.,Chan Albert P.C.,Lam Patrick T.I.,Wong James M.W.
Abstract
PurposeThe paper aims to present a succinct review of guaranteed maximum price (GMP) and target cost contracting (TCC) concepts and features in general, and to identify the critical success factors for procuring GMP/TCC contracts from the Hong Kong perspective in particular.Design/methodology/approachBy means of an empirical questionnaire survey geared towards industrial practitioners with direct hands‐on GMP/TCC experience, the opinions of various contracting parties including clients, consultants and contractors were solicited, analysed and compared in relation to GMP/TCC success factors.FindingsExperienced practitioners shared the unanimous perception that: reasonable share of cost saving and fair risk allocation; partnering spirit from all contracting parties; right selection of project team; well‐defined scope of work in client's project brief and early involvement of contractor in design development, are the most essential ingredients for the successful implementation of GMP/TCC scheme.Research limitations/implicationsAlthough the research study is based in Hong Kong with a limited sample size, the survey findings and hands‐on experience of the relevant industrial practitioners may be cross‐referenced to other similar investigations in other parts of the world for international comparisons.Originality/valueThe research study has provided some useful insights into assisting key project stakeholders in determining important successful ingredients when launching GMP/TCC scheme. Such an identification of critical success factors would be valuable in formulating effective practical strategies to improve overall project performance, create win‐win opportunities for contracting parties and mitigate the occurrence of construction disputes/claims. It also attempts to seek more research evidence to capture the levels of success and lessons learned from previous GMP/TCC construction projects for generating best practice recommendations for future implementation.
Subject
Management of Technology and Innovation,Strategy and Management,Business and International Management
Reference47 articles.
1. Albright, S.C., Winston, W.L. and Zappe, C. (2006), Data Analysis and Decision Making with Microsoft® Excel, 3rd ed., Thomson South‐Western, Pacific Grove, CA.
2. Blumkin, M. and Schwartz, A. (2003), “To GMP or not to GMP? That is the question facing many project owners”, The Real Estate Finance Journal, pp. 24‐5.
3. Boukendour, S. and Bah, R. (2001), “The guaranteed maximum price contract as call option”, Construction Management and Economics, Vol. 19 No. 6, pp. 563‐7.
4. Broome, J.C. and Perry, J.G. (1995), “Experiences of the use of the New Engineering Contract”, Engineering, Construction and Architectural Management, Vol. 2 No. 4, pp. 271‐85.
5. Cantirino, J. and Fodor, S. (2003), “Construction delivery systems in the United States”, Journal of Corporate Real Estate, Vol. 5 No. 2, pp. 169‐77.
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献