Low estimates – high stakes: underestimation of costs at the front-end of projects

Author:

Andersen Bjorn,Samset Knut,Welde Morten

Abstract

Purpose – The purpose of this paper is to adopt an in-depth perspective on cost estimation, from the development of the initial idea until the budget is agreed, to obtain new insights into issues of underestimation at the front-end. Design/methodology/approach – The study uses a small sample of projects with exceptional increases in cost estimates during the front-end phase. The authors analyzed the magnitude of cost increases and possible reasons for them. Findings – The paper concludes that underestimation in the front-end phase was significant in the sample and poses a serious problem in that suboptimal projects are approved. The causes of underestimation include underestimating risk, overestimating opportunities, inadequate estimation methods and skills, reliance on weak information, and strategic/deliberate scope creep and division of projects. Research limitations/implications – The study builds on a small sample, and hence further studies should be undertaken to verify whether the findings are generalizable. Practical implications – The sample shows that the projects with the most unrealistic early estimates have disputable relevance. The paper suggests a number of recommendations that might help to counter the problem of unrealistic early cost estimates, which in turn, might allow suboptimal projects to be funded. Originality/value – The underestimation of costs at the front-end is grossly neglected in the literature compared with whether costs comply with the budget. While cost overruns are an indication of failure in terms of the project’s tactical performance, the contention is that the up-front underestimation of costs might result in an inferior project being selected and thus affect the strategic performance of the project.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference50 articles.

1. Aibinu, A.A. and Pasco, T. (2008), “The accuracy of pre-tender building cost estimates in Australia”, Construction Management and Economics , Vol. 26 No. 12, pp. 1257-1269.

2. Austeng, K. , Bruland, A. and Torp, O. (2006), Kostnadsutvikling i vegprosjekter (In English: The Development in Costs in Road Projects) , Norwegian University of Science and Technology, Department of Civil and Transport Engineering, Trondheim.

3. Berechman, J. and Wu, Q. (2006), Cost Overruns Risk Analysis in Transport Infrastructure Investments , Phelps Centre for the Study of Government and Business, University of British Columbia, Vancouver.

4. Berg, P. , Andersen, K. , Østby, L.E. , Lilleby, S. , Styrvold, S. , Holand, K. , Korsnes, U. , Rønning, K. and Johansen, F. (1999), Styring av statlige investeringer. Sluttrapport fra styringsgruppen (In English: Governance of Public Investments. Final Report) , Ministry of Finance, Oslo.

5. Cantarelli, C.C. , van Wee, B. , Molin, E.J. and Flyvbjerg, B. (2012), “Different cost performance: different determinants?: the case of cost overruns in Dutch transport infrastructure projects”, Transport Policy , Vol. 22, pp. 88-95.

Cited by 37 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3