A cost evaluation model for IoT-enabled prefabricated construction supply chain management

Author:

Zhang WennanORCID,Kang KaiORCID,Zhong Ray Y.ORCID

Abstract

PurposeThis paper proposes an evaluation model for prefabricated construction to guide a supply chain with controllable costs. Prefabricated construction is prevalent due to area limitations. Nevertheless, the development is limited by budget control and identifying the factors affecting cost. The degree of close collaboration in the supply chain is closely interconnected with cost performance that includes direct and indirect factors. This paper not only quantizes these factors but also distinguishes the degree of influence of various factors.Design/methodology/approachSystem dynamics is applied to simulate and analyze the construction cost factors through Vensim software. It can also clarify the relationship between cost and other influencing factors. The input data are collected from an Internet of Things (IoT)-enabled system under a Building Information Modeling (BIM) system and Hong Kong government reports.FindingsSimulation results indicate that prefabricated construction cost is mainly influenced by government promotion degree (GPD), working pressure from on-site construction (WPOSC), prefab quality (PQ), load-bearing capacity per vehicle (LBPV) and mold quality (MQ). However, it is more sensitive toward GPD, which indicates that the government should take measures to promote this construction technology. On-site worker management is also essential for the assembly process and indirectly influences the construction cost.Research limitations/implicationsThis paper quantifies indirect influential factors to clarify the specific features for prefabricated construction. The investigated factors are limited.Practical implicationsThe contractor can identify all factors and classify the levels of influence to make decisions under the supply chain system boundary.Social implicationsThe input data are collected from an IoT-enabled system under a BIM system and Hong Kong government reports. Thus, the relationship between construction cost influential factors can be investigated.Originality/valueThis paper quantifies indirect influencing factors and clarifies the specific features in prefabricated construction. The contractor could identify these factors to make decisions and classify the levels of influence under the supply chain system boundary.

Publisher

Emerald

Subject

Industrial and Manufacturing Engineering,Strategy and Management,Computer Science Applications,Industrial relations,Management Information Systems

Cited by 24 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3