Author:
Asgari Farid,Jolai Fariborz,Movahedisobhani Farzad
Abstract
Purpose
Pumped-storage hydroelectricity (PSH) is considered as an effective method to moderate the difference in demand and supply of electricity. This study aims to understanding of the high capacity of energy production, storage and permanent exploitation has been the prominent feature of pumped-storage hydroelectricity.
Design/methodology/approach
In this paper, the optimization of energy production and maintenance costs in one of the large Iranian PSH has been discussed. Hence, a mathematical model mixed integer nonlinear programming developed in this area. Minimizing the difference in supply and demand in the energy production network to multiple energies has been exploited to optimal attainment scheme. To evaluate the model, exact solution CPLEX and to solve the proposed programming model, the efficient metaheuristics are utilized by the tuned parameters achieved from the Taguchi approach. Further analysis of the parameters of the problem is conducted to verify the model behavior in various test problems.
Findings
The results of this paper have shown that the meta-heuristic algorithm has been done in a suitable time, despite the approximation of the optimal answer, and the consequences of research indicate that the model proposed in the studied power plant is applicable.
Originality/value
In pumped-storage hydroelectricity plants, one of the main challenges in energy production issues is the development of production, maintenance and repair scheduling concepts that improves plant efficiency. To evaluate the mathematical model presented, exact solution CPLEX and to solve the proposed bi-objective mixed-integer linear programming model, set of efficient metaheuristics are used. Therefore, according to the level of optimization performed in the case study, it has caused the improvement of planning by 7%–12% and effective optimization processes.
Subject
Management Science and Operations Research,Strategy and Management,General Decision Sciences
Reference58 articles.
1. A set of calibrated metaheuristics to address a closed-loop supply chain network design problem under uncertainty;International Journal of Systems Science: Operations and Logistics,2019
2. Innovative approaches to design and address green supply chain network with simultaneous pick-up and split delivery;Journal of Cleaner Production,2020
3. Medium-term optimization-based approach for the integration of production planning, scheduling and maintenance;Computers and Chemical Engineering,2018
4. Optimal operation of virtual power plant in a day ahead market,2019
5. Non-dominated ranked genetic algorithm for solving multiobjective optimization problems. Paper presented at the NRGA;Journal of Theoretical and Applied Information Technology,2008
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Planning of prescriptive maintenance types for generator with fuzzy logic-based genetic algorithm in a hydroelectric power plant;Expert Systems with Applications;2024-04
2. Design and analysis of electric spring based on battery-less current-source inverter;COMPEL - The international journal for computation and mathematics in electrical and electronic engineering;2024-02-15
3. Energy Storage Applications in Renewable Energy Systems;Smart Grids—Renewable Energy, Power Electronics, Signal Processing and Communication Systems Applications;2023-11-22