Abstract
PurposeProject schedules have a vital role in the effective management of time, cost, scope and resources in construction projects, and creating schedules requires schedulers with construction knowledge and experience. The increase in the complexity of building projects and the emergence of building information modeling (BIM) in the architecture, engineering and construction industry have encouraged researchers to explore BIM capabilities for automated schedule generation. The scope and capabilities of the developed systems, however, are limited and the link between design and scheduling is still underdeveloped. This paper aims to investigate methods to develop a BIM-based framework to automatically generate schedules for concrete-framed buildings.Design/methodology/approachThis system first extracts the required data from the building information model, including elements’ dimensions, quantities, spatial information, materials and other related attributes. It then applies construction rules, prior knowledge and production rate data to create project work-packages, calculate their durations and determine their relationships. Finally, it organizes these results into a schedule using project management software.FindingsThis system provides an automated and easy-to-use approach to generate schedules for concrete-framed buildings that are modeled in a BIM platform. It provides two schedules for each project, both a sequential and an overlapped solution, which the schedulers can modify into a practical schedule based on conditions and available resources.Originality/valueThis research project presents an innovative approach to use BIM-based attributes of structural elements to develop list of work-packages and estimate their durations, and then it uses a combination of rule-based and case-based reasoning to generate the schedules.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference34 articles.
1. A method for facilitating 4D modeling by automating task information generation and mapping,2019
2. American Institute of Architects (2013), “G202-2013 project BIM protocol”, available at: www.aiacontracts.org/contract-documents/19016-project-bim-protocol
3. Fuzzy enabled hybrid genetic algorithm–particle swarm optimization approach to solve TCRO problems in construction project planning;Journal of Construction Engineering and Management,2011
4. Resource‐constrained project scheduling for timely project completion with stochastic activity durations;Production and Operations Management,2009
5. The project benefits of building information modelling (BIM);International Journal of Project Management,2013
Cited by
32 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献