Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka

Author:

Pararajasingam Ramgy,Waidyasekara Anuradha Samarajeewa,Victar Hasith Chathuranga

Abstract

Purpose Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery. Design/methodology/approach Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016. Findings Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns. Originality/value The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Publisher

Emerald

Reference43 articles.

1. Importance of planning for the transport stage in procurement of construction materials,2014

2. Energy saving performance assessment and lessons learned from the operation of an active phase change materials system in a multi-storey building in Melbourne;Applied Energy,2019

3. The effect of poor materials management in the construction industry: a case study of Abuja, Nigeria;Acta Structilia,2021

4. Integrating quantitative and qualitative data in mixed methods research challenges and benefits;Journal of Education and Learning,2016

5. Arijeloye, B.T. and Akinradewo, F.O. (2016), “Assessment of materials management on building projects in Ondo state, Nigeria”, pp. 168-185, available at: www.researchgate.net/publication/308674624_Assessment_of_materials_management_on_building_projects_in_Ondo_State_Nigeria

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3