1. Dynamics of performance measurement systems
2. Bititci, U.S. and Carrie, A.S. (1998),Integrated Performance Measurement Systems: Structures and Relationships, EPSRC Final Research Report, Grant No. GR/K 48174, Swindon.
3. Bourne, M. and Neely, A. (2000), “Why performance measurement interventions succeed and fail”,Proceedings of the 2nd International Conference on Performance Measurement, Cambridge, pp. 165‐73.
4. Burns, N. and Backhouse, C. (1998),Integrated Performance Measurement Systems – Behavioural Issues, EPSRC Final Research Report, Research Grant No. GR/K 48198, Swindon.
5. Coleman, T. (1998), “Performance arts”,InformationWeek, No. 21.