Conflict dynamics in a dam construction project: a case study

Author:

Kishor Mahato Braj,Ogunlana Stephen O.

Abstract

PurposeThe purpose of this paper is to present a model for a comprehensive and integrated approach to managing interface conflict from the early stages of a dam construction project.Design/methodology/approachA case study methodology is adopted. Following comprehensive literature review, qualitative data were gathered from case studies through interviews conducted on the Middle Marsyangdi Hydroelectric Project (MMHEP) dam project in Nepal. Causal loop diagrams on the typical evolution of key indicators of interface conflict were then developed and a simulate‐able model of interface conflict was derived using system dynamic modeling technique. The model was then simulated to derive viable policies for future management of dam construction projects in developing countries.FindingsThe study reveals that interface conflicts at the construction stage of projects are caused mainly by lack of effective Environmental Impact Assessment, public participation and mutual consultation, on timely basis and accurate information from the early stages of projects. The system dynamic model is able to replicate general behavior of evolution of interface conflict in a dam construction project. Furthermore, the study explored three viable policies to avoid and minimize interface conflict in the construction stage of a dam project. The policies were tested and demonstrated to be useful in improving the value of projects to stakeholders. It is demonstrated that a combination of policies is better than adopting a single policy to stakeholder management.Originality/valueThe paper demonstrates the utility of system dynamics as a modeling tool for understanding the dynamics of conflicts on dam construction projects. The model should be helpful to policy makers on large projects, especially those likely to be subject to social and environmental conflict. Policies derived from the model have the potential of being used to assess and take proactive measures to manage conflicts effectively and efficiently from early in a project's life.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference33 articles.

1. Asian Development Bank (ADB) (2007), Dam's Impact and Effectiveness, Part four, NGO Forum on ADB Guidebook Series, ADB, Manila, available at: www.adb.org (accessed November 2, 2007).

2. Awakul, P. and Ogunlana, S.O. (2002a), “The effect of attitudinal differences on interface conflicts on large scale construction projects: the case of the Pak Mun Dam project”, Environmental Impact Assessment Review, Vol. 22 No. 4, pp. 311‐35.

3. Awakul, P. and Ogunlana, S.O. (2002b), “The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study”, Journal of Construction Management and Economics, No. 20, pp. 365‐77.

4. Awakul, P. and Ogunlana, S.O. (2004), “Interface conflicts on large construction projects”, Asian Infrastructure, Research Review, Vol. 6 No. 1, pp. 35‐45.

5. Bureekul, T. (2000), Public Participation in Environmental Management in Thailand, King Prajadhipok's Institute, Nothanburi.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3