The gold standard: developing a maturity model to assess collaborative scheduling

Author:

Scala Natalie M.ORCID,Liu MinORCID,Alves Thais da Costa LagoORCID,Schiavone Vincent,Hawkins Dominique

Abstract

PurposeThe overall contribution of this work is to provide a usable maturity model for collaborative scheduling (CS) that extends the literature, identifies inconsistencies in schedule development, and improves collaboration in the construction industry.Design/methodology/approachVia subject matter expert elicitation and focus groups, the maturity model establishes five pillars of collaboration—scheduling significance, planners and schedulers, scheduling representation, goal alignment with owner, and communication. The maturity model is then validated through iterative feedback and chi-squared statistical analysis of data obtained from a survey. The five pillars are tied to the literature and previous work in CS.FindingsThe analysis shows that current industry projects are not consistent in collaboration practice implementation, and the maturity model identifies areas for collaboration improvement. The study's contributions to the body of knowledge are (1) developing a maturity model-based approach to define and measure the current level of collaboration and (2) discovering the level of consistency in scheduling collaboration practice implementation.Practical implicationsThe findings provide a benchmark for self-evaluation and peer-to-peer comparison for project managers. The model is also useful for project managers to develop effective strategies for improvement on targeted dimensions and metrics.Originality/valueThe construction engineering and management (CEM) literature does not contain targeted models for scheduling collaboration in the context of maturity and, broadly speaking, neither does the literature at large. The literature also lacks actionable items as presented for the maturity model for collaborative scheduling (MMCS).

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference49 articles.

1. American Institute of Architects—AIA (2017), “AIA document 201®- 2017 general conditions of the contract for construction”, available at: https://www.aiacontracts.org/contract-documents/25131-general-conditions-of-the-contract-for-construction (accessed 18 May 2021).

2. Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: multiple baseline study;Journal of Construction Engineering and Management,2014

3. Schedules and schedulers: a study in the U.S. construction industry;Engineering Management Journal,2020

4. Project delivery contract language, schedules, and collaboration,2021

5. Project maturity in organizations;International Journal of Project Management,2003

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3