Predicting the project time and costs using EVM based on gray numbers

Author:

Nadafi Samira,Moosavirad Seyed HamedORCID,Ariafar Shahram

Abstract

Purpose The purpose of this paper is to determine the project completion time and cost under non-deterministic conditions using interval gray numbers (IGNs). Design/methodology/approach The earned value management (EVM) method based on the IGN has been developed. Findings The EVM method based on the IGN has been verified by a numerical example that can be applied to construction projects. Practical implications The EVM method, based on the gray numbers, reduces the budget and time shortage risk. Also, using this method, the managers would not be restricted to provide very exact values in their progress reports in the non-deterministic conditions. Originality/value One notable and significant point in all projects during the execution process is to estimate the project completion time and cost. However, non-deterministic conditions for both planned and actual physical completion percentage of projects have not been considered for predicting the project completion time and cost in the literature. Therefore, the novelty of this paper is the prediction of project completion time and cost under non-deterministic conditions using IGN.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference43 articles.

1. Beyond earned value management: a graphical framework for integrated cost, schedule and risk monitoring;Procedia – Social and Behavioral Sciences,2013

2. Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm;Computers and Industrial Engineering,2017

3. A hybrid integer grey programming for an integrated problem of project selection and scheduling with interval data;Journal of Industrial and Production Engineering,2018

4. Estimation of project performance using earned value management and fuzzy regression;Shiraz Journal of System Management,2014

5. Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management;International Journal of Project Management,2015

Cited by 17 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Grey Earned Duration Management;IOP Conference Series: Earth and Environmental Science;2024-06-01

2. Project cost forecasting based on earned value management and Markov chain;Annals of Operations Research;2024-03-07

3. Enhanced ESM approach for duration forecasting in delayed projects;Ain Shams Engineering Journal;2024-03

4. Predicting construction cost under uncertainty using grey-fuzzy earned value analysis;Heliyon;2024-03

5. Selecting EVM, ESM and EDM(t) for managing construction project schedule;Engineering, Construction and Architectural Management;2023-06-16

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3