BDM–MDM integrated solution concept for scheduling information-driven projects

Author:

Maheswari J. Uma,Mujumdar PurvaORCID,Padala S.P. SreenivasORCID,Gwaskoti Abhishek

Abstract

PurposeScheduling in information-driven design phase of construction projects is challenging due to multiple entity types (teams, components, deliverables, activities or parameters) and their dependencies/linkages. Established techniques such as dependency structure matrix (DSM), beeline diagramming method (BDM), multiple domain matrix (MDM), etc. have been independently utilized in past to model information dependencies/linkages and associated iteration. However, there has not been a holistic solution yet for scheduling multiple entity types and their relationships. Hence, an integrated solution needs to be developed that schedules information-driven projects accurately.Design/methodology/approachA case study data collection approach is utilized. With data from two projects, i.e. hostel design and highway design, a BDM–MDM integrated solution was developed and applied to the same. Feedback from experts was obtained for refinements.FindingsThe proposed solution is efficient for scheduling multiple entity types and their information dependencies/linkages.Practical implicationsThe proposed integrated solution enables the project participants to schedule information-driven projects systematically. Application to two distinct design cases emphasizes that the concept is generic and can be applied to any information-driven project with multiple entity types.Originality/valueThe BDM–MDM integrated solution concept is investigated for scheduling multiple entity types in any information-driven projects. This study also explored the terminologies such as multiple entity types and information-driven scheduling.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference34 articles.

1. Application of the analytical design planning technique to construction project management;Project Management Journal,2000

2. Strategies for overlapping dependent design activities;Construction Management and Economics,2006

3. Utilization of dependency structure matrix analysis to assess complex project designs,2002

4. Modelling impacts of process architecture on cost and schedule risk in product development;IEEE Transactions on Engineering Management,2002

5. A simulation based process model for managing complex design projects;IEEE Transactions on Engineering Management,2005

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3