1. Armour, G.C. and Buffa, E.S. (1963), “A heuristic algorithm and computer simulation approach to relative location of facilities”, Management Science, Vol. 9 No. 1, pp. 294‐309.
2. Cheng, M.Y. and O’Connor, J.T. (1996), “ARCSITE: enhanced GIS for construction site layout”, Journal of Construction Engineering and Management, Vol. 122 No. 4, pp. 329‐36.
3. Dawood, N.N. (1994), “Developing a production management modelling approach for precast concrete building products”, Construction Management and Economics, Vol. 12 No. 5, pp. 393‐412.
4. Dawood, N.N. (1995), “An integrated knowledge‐based/simulation approach to production planning: an application to the pre‐cast industry”, Construction Management and Economics, Vol. 13 No. 1, pp. 53‐64.
5. Fortenberry, J.C. and Cox, J.F. (1985), “Multiple criteria approach to the facility layout problem”, International Journal of Production Research, Vol. 23 No. 4, pp. 773‐82.