An integrated approach for lead time reduction of military aircraft major overhaul

Author:

Saravanan J.,Thakkar Jitesh J.

Abstract

Purpose The purpose of this paper is to investigate into the improvement strategies for lead time reduction of military aircraft major overhaul (enhance the overhaul task from present seven to nine-plus aircrafts as agreed to customer) for ABC Company. Design/methodology/approach This research has been conducted based on the available knowledge and extensive experience gained while working in the overhaul unit of the case organization for a long period of time. The research employs an integrated approach of multi-criteria decision method (in specific analytic hierarchy process (AHP)), theory of constraint (TOC) and simulation for M/M/1/K queuing environment for investigating the improvement strategies for lead time reduction in major overhaul of military aircraft. This has mainly included: Step 1: analysis of existing activity network using actual overhaul data; Step 2: ranking of constraint activities that most affects the lead time using AHP; Step 3: revised flow activity network using time buffers (TBs) concept of TOC; Step 4: mathematical model formulation for effective utilization of TB using single server finite queuing approach (M/M/1/K queuing environment); Step 5: discrete event simulation representing present overhaul conditions and revised overhaul conditions with different scenarios; and Step 6: sensitivity analysis and interpretation of results. The proposed methodology has been tested on an industrial case study dealing with an aircraft overhaul in India (namely ABC Company). Findings The proposed overhaul lead-time reduction plan points out the augmentation of resources in order to achieve more than 50 per cent reduction in lead time and waiting time under two scenarios – with overtime and without overtime. Research limitations/implications An integrated approach proposed has so far been applicable to the specific aircrafts (Jaguar/Mirage/Kiran) of the ABC Company overhaul division. However, the particular methodology can be proved potentially useful and highly practical when applying to other aircraft types. Originality/value The results indicate several problems with the current overhaul strategies that need focused process improvements and a need for capacity augmentation for achieving the enhanced overhaul task of nine+ aircrafts per year with reduced overhaul lead time. The proposed approach also provides the maintenance planners with a platform for decision analysis and support often ignored the capacity augmentation.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference48 articles.

1. Dynamic buffering of a capacity constrained resource via the theory of constraints,2011

2. Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates;European Journal of Operational Research,2011

3. An intelligent condition-based maintenance scheduling model;International Journal of Quality & Reliability Management,2007

4. Relevant costs, congestion and stochasticity in production environments;Journal of Accounting and Economics,1988

5. A maintenance inspection model: optimal and heuristic solutions;International Journal of Quality & Reliability Management,1998

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3