Abstract
Purpose
The purpose of this paper is to present a new mathematical model for the unrelated parallel machine scheduling problem with aging effects and multi-maintenance activities.
Design/methodology/approach
The authors assume that each machine may be subject to several maintenance activities over the scheduling horizon and a machine turn into its initial condition after maintenance activity and the aging effects start anew. The objective is to minimize the weighted sum of early/tardy times of jobs and maintenance costs.
Findings
As this problem is proven to be non-deterministic polynomial-time hard (NP-hard), the authors employed imperialist competitive algorithm (ICA) and genetic algorithm (GA) as solution approaches, and the parameters of the proposed algorithms are calibrated by a novel parameter tuning tool called Artificial Neural Network (ANN). The computational results clarify that GA performs better than ICA in quality of solutions and computational time.
Originality/value
Predictive maintenance (PM) activities carry out the operations on machines and tools before the breakdown takes place and it helps to prevent failures before they happen.
Subject
Management Science and Operations Research,Strategy and Management,General Decision Sciences
Reference45 articles.
1. Multi-objective scheduling of dynamic job shop using variable neighborhood search;Expert System with Applications,2010
2. Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects;Computers and Operations Research,2013
3. Designing MIMO PID controller using colonial competitive algorithm: applied to distillation column process, control and intelligent processing center of excellence;IEEE Congress on Evolutionary Computation,2008
4. Imperialist competitive algorithm: an algorithm for optimisation inspired by imperialistic competition;IEEE Congress on Evolutionary Computation (CEC 2007),2008
5. A discrete colonial competitive algorithm for hybrid flow shop scheduling to minimize earliness and quadratic tardiness penalties;Expert System with Applications,2011
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献