Applying claim reduction criteria in selecting efficient contractors with the two-step grey data envelopment analysis approach

Author:

Asnaashari HamidORCID,Sheikh Aboumasoudi AbbasORCID,Mozaffari Mohammad Reza,Feylizadeh Mohammad RezaORCID

Abstract

PurposeThe application of correct contractor selection strategies leads to the selection of a qualified contractor and, as a result, the on-time delivery of the project with the desired quality and within the predetermined budgetary constraints. For this reason, evaluating and qualifying contractors before reviewing the proposed prices has been considered an important issue. One factor that disrupts the project completion process and the failure to achieve pre-planned goals effectively is the occurrence of contractors' disputes and claims in projects. To this end, the present study explores claim-reduction strategies for selecting effective contractors in an uncertain environment to reduce possible problems.Design/methodology/approachThe two-step grey data envelopment analysis (GDEA) approach was used to measure efficiency as a powerful tool in selecting efficient contractors during tenders. This approach can extend the applications of multi-criteria decision-making (MCDM) models. In other words, given some uncertainties, the unavailability of some data, and the problems with the DEA model, the two-step GDEA model was used to rank the contractors. The data confirmed the satisfactory outcomes from the selected model.FindingsThe preliminary assessment of contractors is a pre-tendering process and a step in categorizing contractors, excluding contractors lacking required qualifications, and selecting efficient contractors. At first, it will help the employer to exclude inexperienced and unqualified contractors, save resources and time, reduce threats, replace opportunities with threats, and reduce material and non-material costs during the completion of the project until the projects are put into operation. Consequently, this approach reduces claims to a minimum level and increases the organization's effective material and non-material profit.Originality/valueOil and gas plans and projects have a significant, sensitive, and decisive role in the economic, social, political, cultural, infrastructural, and all-round development of Iran; This is while most of the financial resources needed to implement the development and programs across the country come from oil revenues. Studies have indicated that despite the importance of these plans and projects, many of them are not completed successfully, and this causes irreparable losses to the country's economy and development in various fields.HighlightThe findings of this study can be used by organizations to select more effective contractors to assign projects and plans to them.The preliminary assessment of contractors is a pre-tendering process and a step in categorizing contractors, excluding contractors who lack required qualifications, and finally selecting efficient contractors.At first, it will help the employer to exclude inexperienced and unqualified contractors, save resources and time, reduce threats, replace opportunities with threats, and reduce material and non-material costs during the completion of the project until the projects are put into operation.This approach also gives credit to the employer during the execution period and contributes to assessing unqualified contractors and reducing the temptation to hand over the project to an unqualified contractor but with a lower bid price.Consequently, this approach reduces claims to a minimum level and increases the effective material and non-material profit of the organization.Moreover, it provides an extra-organizational evaluation for contractors, motivating them to upgrade their capabilities and optimally allocate material and non-material resources, especially human resources.

Publisher

Emerald

Subject

Applied Mathematics,General Computer Science,Control and Systems Engineering

Reference61 articles.

1. Dealing with value constraints in decision making using MCDM methods;Journal of Computational Science,2020

2. Conflicting factors in construction projects: Korean perspective. In Engineering;Construction and Architectural Management,2006

3. Prioritizing contractors selection using DEA-R and AHP in Iranian oil pipelines and telecommunication company;International Journal of Data Envelopment Analysis,2013

4. Research on the regional leading industry selection of ‘Kashgar urban agglomerations’ based on multi-attribute weighted intelligent grey target decision-making evaluation model;Grey Systems: Theory and Application,2021

5. Some models for estimating technical and scale inefficiencies in data envelopment analysis;Management Science,1984

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3