Abstract
Purpose
Construction is repeatedly criticised for its low productivity based on statistical data that do not represent the output of construction adequately. The purpose of this paper is to improve the understanding of construction output – being the numerator in construction productivity calculations – by focussing on changes in quantity of the products, product characteristics and composition of the aggregate rather than as changes in price.
Design/methodology/approach
The research design of this study applies statistical data from the national accounts along with data from four paradigmatic case studies of social housing projects covering a period of 50 years.
Findings
The results indicate that while construction output prices have increased threefold over the past 50 years, improvements in performance can only explain approximately 20 per cent.
Research limitations/implications
The developed four-step method has demonstrated its value as a means to measure changes in the characteristics of the product, but more studies on the actual figures and results over time and regions are required before solid conclusions can be drawn.
Social implications
This study has added new knowledge of construction output that supports the development of a more accurate construction statistics, which in turn can assist the design of more effective and evidence-based policies for improving construction productivity.
Originality/value
This paper describes and demonstrates a novel performance-based methodology for addressing changes in the characteristics of the products in a longitudinally perspective, which can potentially provide a better understanding of changes in productivity.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference76 articles.
1. Time series analysis for construction productivity experiments;Journal of Construction Engineering and Management,1999
2. Trends of productivity growth in the construction industry across Europe, US, and Japan;Construction Management and Economics,2011
3. US construction labor productivity trends, 1970–1998;Journal of Construction Engineering and Management,2000
4. Huse på den halve tid (House building in half the usual time), SBI forlag, København (in Danish),1966
5. Evaluation of construction contractor performance: a critical analysis of some recent research;Construction Management and Economics,2006
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献