1. Preiser, W.F.E. (1997), “Applying the performance concept to post‐occupancy evaluation”, International Journal of Facilities Management, Vol. 1 No. 4, pp. 179‐84.
2. Feedback, feedforward and control: post-occupancy evaluation to the rescue
3. Schramm, U. (1996), “Post‐occupancy evaluation in the cross‐cultural context: a field study on the performance of health care facilities in Egypt and other countries”, Proceedings CIB‐ASTM‐ISO‐RILEM 3rd International Symposium, Tel Aviv.