Purpose
Refurbishment is inherently more sustainable than building new. However, planned and actual costs of refurbishment projects are bound to vary due to the complex nature of most such projects. This can affect the performance of refurbishment work. The purpose of this paper is to examine factors responsible for elemental cost variations between the actual and planned costs of refurbishment projects. The study also examines factors that contribute to differences in actual and planned cost between refurbishment and new build projects.
Design/methodology/approach
A quantitative approach was adopted for this study. A literature review identified factors responsible for elemental cost variations in refurbishment projects, as well as factors responsible for differences in actual and planned cost of new build and refurbishment projects. This was followed by a questionnaire survey of refurbishment projects across Malaysia. A total of 55 respondents provided input through a questionnaire survey to identify these factors.
Findings
This study demonstrates that procurement strategy (PS), inappropriate contractors (IC), poor project management (PPM), availability of funding, materials and equipment, and force majeure (FM) significantly affect refurbishment cost performance. Electrical installations, firefighting equipment, and painting were the building elements most affected by cost variations. A regression model for refurbishment cost prediction indicates that PS, IC, PPM, availability of funding, materials and equipment, and FM were significant predictors of building refurbishment cost performance.
Originality/value
This paper provides insight into the major factors affecting elemental cost variation of refurbishment works, as well as building elements most affected by cost variations and provides a model for predicting refurbishment cost performance.
Subject
Building and Construction,Civil and Structural Engineering
Reference71 articles.
1. Significant factors causing cost overruns in large construction projects in Malaysia;Journal of Applied Science,2013
2. Delay factors and time-cost performance of construction projects in Gaborone city council, Botswana;Journal for the Advancement of Performance Information & Value,2016
3. The impact of contractors’ management capability on cost and time performance of construction projects in Nigeria;Journal of Financial Management of Property and Construction,2009
4. The designer in refurbishment projects: implications to the compatibility of design;Structural Survey,2013
5. Complexity of statutory requirements: case study of refurbishment projects in Malaysia;Journal of Building Performance,2012
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献