Abstract
PurposeThis research paper aims to establish a comprehensive framework for the barriers to CER in the construction industry, assesses the barriers' relative degrees of hindrance and causal mechanisms.Design/methodology/approachFirstly, 26 carbon emission reduction (CER) barriers in the construction industry were identified based on a systematic literature review (SLR) and categorized into five dimensions: policy, economy, society, technology and organization (PEST + O model). Secondly, the Best–Worst Method (BWM) was used to clarify the degrees of hindrance of the CER barriers. Then, the Grey-Decision-Making Trial and Evaluation Laboratory (Grey-DEMATEL) was used to visualize the directional cause–result relationship network among prominent barriers. Finally, the Boston matrix model was used to propose differentiated strategies to address CER barriers in the construction industry.FindingsThe calculated centrality and causality of the prominent barriers indicated that the lack of relevant legal policies and normative guidelines, the poor binding force and enforcement of existing relevant policies, the lack of effective economic subsidies and incentives and the difficulty in the operation, transformation and upgrading of existing construction CER are the key barriers that CER needs to address first in the construction industry. Considering the order of priority and the optimal path, differentiated countermeasures are proposed to address key, driving, independent and effect barriers.Originality/valueThis study develops a BWM–Grey-DEMATEL integrated multi-criteria decision-making model. An innovative C-shaped strategic map for addressing CER barriers in the construction industry is proposed by integrating the dual dimensions of time and space. This will guide practitioners, policymakers and decision-makers in developing CER strategies.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering